Improvement works are now complete on the Elizabeth Bailey field in Strood Green.

EB4

EB Play Equipment

Stage one saw the installation of new play equipment and safety matting.

The new improved equipment has proved to be very popular with younger children.

Later in the year the rest of the field was ploughed up, the top soil removed, drainage pipes installed and top soil put back.

EB3

 

EB1

The ground has been levelled and seeded to provide a well drained and level play field. Previously the ground was water logged and unsuitable for play in the winter months. The drainage works were carried out using a grant from Mole Valley District Council.

EB2

 EB Pond

The pond has been improved with the edges being made shallow to encourage wildlife. The field is a great asset and enjoyed by residents both young and old.